Print Page

Font Size:
3D Simulator MELSOFT Gemini

Gemini

ABOUT
"3D Simulator MELSOFT Gemini"

Manufacturing with Visible "Results"
Before Launch.

Confirmation of people's flow lines!Calculation of operating rate and operating time! Conventional design phase and work duration

Amidst the digital transformation trend, a demand has emerged to speed up the process from product planning to commercialization, however there are hurdles to this, such as an increase in the labor time required for rework due to problems upon launch of line and equipment at production sites.

Mitsubishi Electric dramatically improves this problem with a 3D simulator
that can verify line equipment in a digital space.
Before launching, we can make "results" visible.

What is a
3D
Simulator?

Pre-verification is performed in the digital space of a virtual factory or equipment line.
This significantly reduces cost and time during the design phase.

 Movie

3D Simulator MELSOFT Gemini Introduction Full Ver. (English)

 Related materials

Create: Dec 2022
Size: 19.6MB (PDF)