USE CASE
3D Simulators Are Ideal for Users with the Below Types of Concerns.
Line Simulation
Want to pre-verify line changes to prevent rework such as redesign and additional construction.
Pre-verification and effectiveness verification of improvement measures before actual line construction.
Significant reduction in rework labor and shorter construction period!
Equipment Simulation
Actual on-site adjustment takes a huge amount of time which majorly delays launch.
Pre-verification of mechanical operations
in a digital space is possible
with a control program.
Shorter on-site adjustment period!
Breakdown Maintenance
Not possible to verify line/equipment defects during operation without visiting site.
Reproduce remote line/equipment conditions.
Effective troubleshooting!