Start main contents

  • Register
  • Login

Print Page

Font Size:
Product

Product Features

Preventive maintenance function

AI function

The preventive maintenance function lets you know beforehand when parts should be maintained or replaced.
Maintenance is now even more efficient.

  • Applicable parts: Reduction gears, encoders, batteries.
  • Applicable robot models: Please refer to the catalog "MELFA Smart Plus".

For details on this function, please refer to the catalog "MELFA Smart Plus".

Supported robots

Robot TypeRobot controllerRT ToolBox3(*1)
FR seriesRV-2FR(L), RV-4FR(L), RV-7FR(L/LL), RV-13FR(L), RV-20FR
RH-3FRH, RH-6FRH, RH-12FRH, RH-20FRH, RH-3FRHR
CR800-D/R/Q Ver.A3 or later.Ver.1.30G or later
CR seriesRV-8CRL
RH-3CRH, RH-6CRH
CR800-D Ver.A5p or laterVer.1.90U or later

*1) Simulation is not supported when using RT ToolBox3 mini.

Maintenance simulation

The preventive maintenance function estimates the recommended maintenance period and when to replace consumable parts.
This is done by observing repeat patterns in sample programs used by the robot or executed in the simulator in RT Toolbox3.

  • Grease replenishment period (per axis)
  • Timing belt replacement period (per axis)
  • Recommended maintenance period for overhaulable parts (per axis)*1

*1 For overhaulable parts such as reduction gears, bearings, ball screws, the internals of ball splines, the part which needs to be overhauled the earliest will be displayed.

Maintenance simulation

Wear calculation function

  • A function that calculates the wear of components(*2) from the operational status (current, load, etc.) based on the robot's movements and posture.
  • It also calculates the time left until inspection, maintenance and overhaul periods.
  • It is possible to check more detailed information than the "Maintenance forecasting".

*2 The wear ratio of each part is a reference value to assist the maintenance and inspection schedule calculated based on the robot's operational status. It does not guarantee that this is the actual remaining life of the part.
*3 Download sample GOT screen data from the Mitsubishi Electric FA Global Website.

Wear calculation function
Subscribe
Receive the latest headlines, right to your inbox
Page Top