Factory Automation

Energy Saving Supporting DevicesEnergy Saving Data Collecting Servers

    It Can Be Connected at MODBUS RTU/TCP Communication

    • Using the LAN interface (CH2) of EcoWebServerIII, realize MODBUS TCP communication.
      (As with the case of MC protocol communication)
    • Using the LAN CH2 of EcoWebServerIII, via MODBUS TCP ⇔ MODBUS RTU converter, realize MODBUS RTU communication. *1
    • *1MODBUS TCP ⇔ RTU converter is required for MODBUS RTU communication.
      That has been functionally verified is SI-485 MB, SI-485 MB2 by LINEEYE CO., LTD.
    • *2Only EMU4-FD1-MB can be connected and it needs an optional unit (Model name: EMU4-CM-MT)
    • *3It needs an optional unit (Model name: ME-0000MT-SS96)

    Detect Target Excess and Facility Abnormality Instantaneously by Alarm Output and Email Notification

    • It is possible to send an email notification and an alarm output in case of the occurrence of target excess or facility abnormality, so you can catch a condition change at once. It is possible to accelerate the PDCA cycle from problem finding to measure taking and improve the productivity.
    • Smartphones and tablets are supported, so you can check the alarm contents and email notifications on the site.

    Alarm Output/Email Notification

    • *1Ask the network administrator (or administration department) in your company for details.

    Connection With Mitsubishi GOT Display Device

    • Information collected on the EcoWebServerIII can be displayed on the GOT.
    • By displaying the alarm state/measuring value for energy information/demand, real-time monitoring at the site and urgent countermeasures are possible.

    * Demand alarm function can be realized Only MES3-255C-DM-EN.

    Energy-Saving Air Conditioning Operation Realized With Integrated Air-Conditioning Controller

    * MES3-255C-DM-EN only

    • Demand control possible by interconnecting with Mitsubishi Electric Web-compatible integrated controller "AE-200E", "G-150AD", etc.
      Additionally, automatic control of load possible through contact point output via main unit of EcoWebServerIII and CC-Link.

    Download